Saturday, May 15, 2010

Plague Tower: Progress Log 3

So, a lot has progressed since last i posted pictures, primarily the siding has been completed on both sides of the tank, a whole ton of rivets have been glued into place and some conveniently sized pieces of tubing have also been adhered to the front.  Things are really starting to take shape.




Another major detail that was completed was the embelishment of the side "pus tank" made from the living nature water bottle, bands have been glued around it to make it look more industrial and less little critter, and an access hatch has been glued onto the top.




Now moving to the back, you can see the detail of the rear upper hatch, which now has been added, detailing on that piece is a work in progress.



Here's an overall view of the rough plague mortar assembly...



and it's loading hatch...



overall the front looks really bland and there is still a ton of work left to do on this model, but each day is one step closer.


1 comment: